Complete Utilities, Gloucestershire

Complete Utilities, Gloucestershire
Material Source: Excavation and trenching waste from the utilities industries. Equipment Installed: Powerscreen Commander 1400 Feeder, Powerscreen Aggwash, DUO Mobile Water Treatment System (inc. centrifuge, clarified water tank, sludge tank and low-level thickener. Project Requirements: Complete Utilities required a washing and water...
Read More

Grundon, at Kennetholme Quarry

Grundon, at Kennetholme Quarry
The prime objective of the new wash plant is to process ‘as-dug' material in a replacement for the existing Grundon operation at the nearby Padworth Quarry where mineral processing will soon cease. Kennetholme has over 10 years of reserves of a flint based sand and gravel. The new plant site was originally an old paper mill works. Some...
Read More

Nottinghamshire Recycling

Nottinghamshire Recycling
DUO Equipment delivered and installed a new full washing and water management plant for Nottinghamshire Recycling Ltd (NRL). Based in Worksop, Nottinghamshire, NRL is a sustainable waste solution provider processing C & D waste, green waste, wood and recycled aggregates. The new washing and water management plant (which includes a...
Read More

Tarmac, Shireoak

Tarmac, Shireoak
Tarmac is a leading supplier of aggregates, mortar, concrete blocks, asphalt and ready mixed concrete. The Tarmac Shireoak site north of Birmingham is a bunter sand deposit. Raw Material Analysis The material is spilt 50/50 between sand and gravel but the sand is very fine- typically 30% passes the 300mm sieve, 7% of the raw material is...
Read More

CEMEX Kingsmead

CEMEX Kingsmead
At its Kingsmead site, near Horton in Berkshire, where CEMEX produces aggregates to service its concrete plant and to supply the market place, new plant has increased both throughput and flexibility. The 40 hectre Kingsmead site, owned and operated by CEMEX UK has extensive reserves of sand and gravel and has been recently redeveloped as part...
Read More

Hadleys

Hadleys
Material Source: Excavation waste from construction sites.  Equipment Installed: Main components included Commander 1400 Hopper; ;Feed Conveyor; 16 x 5 Rinsing Screen; Logwasher c/ with Dewatering Screens; Finesmaster 120 Sand Plant; 16 x 5 Dry Screen; Bivitec Pre- Screen System; 9m dynamic Thickener; Clarified Water Tank;...