Grundon – Kennetholme Quarry

Grundon – Kennetholme Quarry

Grundon – Kennetholme Quarry case study After effective site surveys and consultations, Duo Group Holdings transformed a former paper mill works in Kennetholme, Berkshire converting it into a plant capable of processing flint-based sand and gravel at 150 tph, to...
Nottinghamshire Recycling

Nottinghamshire Recycling

Nottinghamshire Recycling case study Material source: C & D waste, green waste, wood and recycled aggregates. Equipment installed: GHT Gennaretti 503 variable speed centrifuge system. Project requirements: To install a new, full washing and water management plant...
Tarmac – Shireoak

Tarmac – Shireoak

Tarmac – Shireoak case study Material source: 50/50 split between gravel and fine sand Equipment installed: Commander 1400 10x5 2 deck full rinser Powerscrub 120R Finesmaster 120 Commander 1400 10x5 2 deck part rinser 6 T5032 conveyors Pegson cone crusher...
CEMEX – Kingsmead

CEMEX – Kingsmead

CEMEX – Kingsmead case study Material source: Stone rich sand and gravel from a 2.5 million tonne supply. Project requirements: To redevelop an existing site that had come to the end of its useful life, using new plant with the capacity to process up to 300,000...
Hadleys

Hadleys

Hadleys case study Material source: Excavation waste from construction sites. Equipment installed: Main components included: Commander 1400 Hopper Feed Conveyor 16 x 5 Rinsing Screen Logwasher c/ with Dewatering Screens Finesmaster 120 Sand Plant 16 x 5 Dry Screen...